2. HPP GÖSSENDORF
2.1. PLANT OVERVIEW AND CFD MODEL
The plant consists of two units with a maximum discharge of Q = 100 m³/s
per turbine and a total nominal power of P = 18.75 MW. Its yearly production
amounts to 89 GWh, and the units were brought into operation in 2012. Each unit
consists of a bulb turbine with 16 guide vanes, a 4-blade runner and a nominal
diameter of DNominal = 3.6 m as well as a straight conical draft tube (Table 1).
Table 1: Turbine main data of HPP Gössendorf
Year of construction 2010-2012 Rotational speed 150 rpm
Number of units 2 # Runner diameter 3.6 m
Max. flowrate per unit 100 m³/s Number of blades 4 #
Net head 11.2 m Level maschine axis 314 masl
Maximum power 18.75 MW Head water level 330.8 masl
A lack of efficiency could be identified for turbine no. 2 (closer to the pier,
see Fig. 1) at only a short time of operation after the start-up of the turbines in
2012. At identical runner blade and guide vane positions of both units the power
output of the two identical turbines was different (see measurement curves later
in Fig. 3). With the help of index tests, a failure at the turbines could be excluded
and the efficiency level in general was tested in a model test as well. During the
hydraulic development phase also a comprehensive numerical investigation of
the turbine with the help of CFD was carried out. An idea regarding the reason for
the lack of power was, that the flow distribution to the turbine must be disturbed
and thus vortices are generated.
During the planning phase of the power plant a model test was carried out
in the course of the hydraulic engineering [9]. During this model test (scale 1:40)
vortex generation could be found in the intake and a new design of the pier was
realised. This new pier works well for flood water, but influences the inflow
situation negatively. The finally designed pier ends 3.5 m below the head water
level and is shown in Fig. 1b. To avoid vortex generation in the intake bed, a
smooth crossover with a ramp (Fig. 1c) and a gravel step (Fig. 1d) with a height
of 2 m (due to rubble in the river bed) were realised.
The model starts 240 m upstream the machine runner. Based on 2D
drawings and profiles for different sections of the river bed, a smoothed simplified
section of the river was generated and is shown in blue in Fig. 1e. Then, the
exact remodelling of the intake situation of the two units, including the three
weirs, started. First, the turbine itself was calculated with a complex model which
is shown in Fig. 1f. It consists of the intake, the bulb and a 360° section of the
guide vanes, a whole runner and the straight draft tube with an enlarged section
downstream. Finally, the entire power plant was investigated. This means, that
the two units were installed in parallel (including turbine, guide vane, draft tube
2253
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik