Seite - 2267 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 2267 -
Text der Seite - 2267 -
clearly understand the differences between Chinese technical standards and
foreign technical standards in project delivery for providing more cost-effective and
environment-friendly hydropower projects worldwide.
2. INTRODUCTION
Over the past 15 years, Chinese contractors play a more and more important
role in the international construction industry with more than 20% annual growth
rate of contract amount (Zhao et al., 2017). Nevertheless, when delivering a global
project, participants from different countries with differing institutionalized practices
may come into conflict (Mahalingam, 2006). Although there exist opportunities,
international hydropower projects also face more uncertainties than domestic
projects since foreign contractors have to work in unfamiliar environments,
including different regulations, norms, and cultural beliefs (Javernick-Will et al.,
2010). In these situations, the unfamiliarity with different environments can
increase misunderstandings and risks, thus result in project delays and cost
overruns (Javernick-Will et al., 2009). Many researchers have studied the impact
of unfamiliar environments on international project delivery. For example, Orr et al.
(2008) built a conceptual framework to analyses unforeseen costs of a project in
an unfamiliar host societal context base on an examination of 23 cases; Han et al.
(2007) indicated that unfamiliarity with different regulations and norms was one of
the significant distinctions between successful and failed international projects
from a comparative case study; Chua et al. (2003) identified five risk factors,
namely business environment discontinuity, contractual issues, differences in
standards, regulation obstacles, and cultural differences, that can lead to cost
overrun in the East Asian construction industry. Among the unfamiliar
environments, such as different regulations, norms and cultural beliefs, technical
standards particularly remain a great challenge for Chinese contractors (Lu et al.,
2009), since technical standards of Chinese and other countries in hydropower
industry can vary significantly. Lei et al. (2017) confirmed that Chinese contractors
perceived significant difference between foreign standards and Chinese
standards, which resulted in greater challenges in implementing foreign standards
in international projects. In order to provide more cost-effective and environment-
friendly projects worldwide, Chinese contractors should more clearly understand
the differences between Chinese technical standards and foreign technical
standards in project delivery.
Although many researchers have pointed out the importance of
understanding the differences of technical standards (Orr et al., 2008; Javernick-
Will et al., 2009; Kwon and Kareem, 2013; Lee et al., 2016; Lei et al. 2017), there
is still a lack of solid and practical investigation to reveal the impacts of the
differences in technical standards on developing international hydropower
projects. Thus, this research aims to demonstrate such impacts on international
hydropower project development processes together with the outcomes.
2267
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik