Energies2019,12, 57
developedin[36],whichcanproducehydrogenwhenthesystemrequiresenergyfromthePEMFC.
Forexample, if the systemstores20kgofNaBH4, thesafety indexes for thehousehold, laboratory,
andoffice loads can be extended by 3.33, 2.10, and 2.90 days, respectively, assuming an inverter
efficiencyof90%. Installing40kgofNaBH4couldguarantee6.17,3.96,and5.44daysofoperationfor
thehousehold, laboratory,andoffice, respectively, in theworstcasescenario.
ȱ
(a)ȱTheȱhouseȱloadȱ (b)ȱTheȱlabȱloadȱ
ȱ
(c)ȱTheȱofficeȱloadȱ
Figure9.Thereferenceplotswithsafetyconsideration.
Table9.Safetyanalyses.
House Lab Office
Dailyaverage (kWh) 19.96 30.41 22.32
Optimalsizes (b, s,w) (23,15,0) (27,21,0) (26,17,0)
LowestSOC(%) 29.99 26.04 27.18
Lowest remainingenergy(kWh) 11.03 7.83 8.97
Safety (days) 0.49 0.23 0.36
1-daysafety
requirement SystemSizes (b, s,w) (33,13,0) (33,24,0) (34,17,0)
SystemCost (USD/kWh) 0.8152 0.7062 0.8266
2-dayssafety
requirement SystemSizes (b, s,w) (33,16,0) (40,24,0) (40,17,0)
SystemCost (USD/kWh) 0.8952 0.7603 0.8735
Thechoiceofasub-optimaldesignorextraNaBH4 stockwoulddependontheestimatedextreme
weatherconditionsandthepriceofNaBH4. For instance, if theexpectedextremeweatherhappens
onedayduringthe61-daysimulation, the total systemcostsare increasedby$25.81,$85.70,and$48.47
for thehousehold, laboratory, andoffice, respectively, using the sub-optimal settings. Conversely,
therequired extraNaBH4 to guarantee sustainability under theworst-case conditions are 3.59 kg,
8.26kg,and5.04kg, respectively,assumingan inverterefficiencyof90%.Thiswill increase thesystem
94
Short-Term Load Forecasting by Artificial Intelligent Technologies
- Titel
- Short-Term Load Forecasting by Artificial Intelligent Technologies
- Autoren
- Wei-Chiang Hong
- Ming-Wei Li
- Guo-Feng Fan
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2019
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-583-0
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 448
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorie
- Informatik