Seite - 203 - in Short-Term Load Forecasting by Artificial Intelligent Technologies
Bild der Seite - 203 -
Text der Seite - 203 -
Energies2018,11, 1948
30Ah, 660W,and200W, respectively. Forexample, (b, s,w)= (1, 2, 3)means that the systemwas
equippedwithone30Ahbatteryset, two660WPVarrays,andthree200WWTs.
The initial cost Ji consistsof several systemcomponents,as follows:
Ji(b,s,w) = ∑
k=component Jki(b,s,w) (6)
wherek=PEMFC,DC, solar,WT,HE,CHG, andbatt for thePEMFC,powerelectricdevices,PVarrays,
wind turbine, hydrogen electrolyzer, chemical hydrogen generator, and battery set, respectively.
Similarly, theoperationcost Jo includes twoparts:
Jo(b,s,w) = ∑
l=component Jlo(b,s,w) (7)
where l=NaBH4,WT,andsolar forchemicalhydrogen,WTmaintenance,andPVmaintenance,respectively.
Thecosts Jki(b,s,w) and J l
o(b,s,w) canbecalculatedbythe followingequations:
Jki(b,s,w) =Ck ·nk ·CRFk (8)
Jlo(b,s,w) =Cl ·nl (9)
inwhichC is thecomponentpriceperunit, andn is thecomponentunits.CRF represents the capital
recovery factorandisdefinedas follows[10]:
CRF= ir(1+ ir)ny
(1+ ir)ny−1 (10)
where ir is the inflationrate,andny is thecomponent life. Thecomponent lifeandcostare listed in
Table2. The inflationratewasset as1.26%byreferring to theaverageannual changeof consumer
price indexofTaiwan[4].
Table2.Simulationparameters.
Component Lifetime Price ($NT)
Hybridsystem 15(year) NA
Fuelcell (3kW) 8000(h) 180,000
Powerelectronicdevices (3kW) 15(year) 50,000
PVarray(0.66kW) 15(year) 45,840
Windturbine (0.2kW) 15(year) 19,333
Hydrogenelectrolyzer (410W) 8000(h) 320,000
Chemicalhydrogengenerator 10 (year) 320,000
NaBH4 (60g/Batch,150LH2) NA 28
Thesystemreliability isdefinedas the lossofpowersupplyprobability (LPSP),as follows[4]:
LPSP= ∑ T
1 LPS(t)
Eload(t) (11)
inwhichthenumerator is the total lossofpowersupplyduringtimeintervalT, andthedenominator
represents the required load demand during time interval T. The system is more reliable with
asmallerLPSP.
203
Short-Term Load Forecasting by Artificial Intelligent Technologies
- Titel
- Short-Term Load Forecasting by Artificial Intelligent Technologies
- Autoren
- Wei-Chiang Hong
- Ming-Wei Li
- Guo-Feng Fan
- Herausgeber
- MDPI
- Ort
- Basel
- Datum
- 2019
- Sprache
- englisch
- Lizenz
- CC BY 4.0
- ISBN
- 978-3-03897-583-0
- Abmessungen
- 17.0 x 24.4 cm
- Seiten
- 448
- Schlagwörter
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Kategorie
- Informatik