the public were verified and understood, action plans were reviewed and a one-team,
one-message environment was maintained.
Since February 7, 2017, over 950 DWR staff, working about 190,000 person
hours, were activated to support the EOC and ICT response and recovery activities.
Communication, command and control, and operational decisions continued to be a
challenge and were a priority during the first 30 days or so. These challenges were
addressed by: twice-daily status briefings, daily team meetings, written daily action
plans, infrastructure condition verification by physical and remote monitoring, twice daily
hydrology modeling, daily meetings with cooperators and contractors, and written daily
reports submitted to the DOC and SOC.
5. BALANCING RISKS AND DECISIONS
5.1 FACTORS CONSIDERED
As the emergency system was being set up, the FCO Spillway was being
assessed, resources were being drawn together, and critical decisions had to be
made. After the initial assessment of the FCO Spillway chute damage was made,
varying amounts of outflow were throttled through the FCO Spillway to determine
what the impact might be on the damaged spillway. Over the next few days, varying
test flows were released to assess the impact of the concrete chute failure on the
ability to use the FCO Spillway to manage expected reservoir inflows. After
considering a number of factors, including increasing reservoir inflows, increasing
reservoir elevation, additional precipitation in the long-range forecasts, size and
depth of the damaged chute area, inability to access the damage chute area, and no
identified temporary repair options or protective measures available, it was decided
that the FCO Spillway had to be used to manage reservoir inflows.
5.1.1 Decision Making Protocol
In any emergency, responders are faced with difficult decisions with limited
information, assessments, and communication. There were a number of competing
factors that made real time decision-making difficult during this emergency. Facing
this dynamic incident, the DWR emergency response teams, regulators, consultants,
and contractors and their supporting partners had to work together in ways that had
not been accomplished in the past. An unfamiliar chain of command, changing
command and control structures, critical specialists in remote locations, information
and data limitations, safety and security, and the size and scope of the incident were
some of the challenges. First and secondary potential impacts or damage to
infrastructure and risks were continuously considered and reevaluated throughout
the duration of the response to ensure public safety. Some of the early policy
directives included transparency and communication with regulators, partners, local
officials, responders, the public, and employees.
The DWR SEMS organization structure was the basis for decision-making
during this incident. Daily and advance planning needed to consider response
52
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik