Seite - 310 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 310 -
Text der Seite - 310 -
B. INSTALLATION OF BOOSTER PUMP AND FLOATING PIPE AS
SUPPORT OF THE DREDGERS
This method is used in order to support sediment flow from zone 1 near
intake to spoilbank area with distance 1500-2000 m at 18 m height.
Specifications of existing dredger with type Hydroland and Ellicot are only able to
drain sediment optimally at a distance of +500 m with a capacity of + 70-100 m3 /
h, so that additional booster is needed, while the previous pipeline using iron pipe
and PVC pipe will be replaced by using HDPE floating pipe to be more efficient
because of the cheaper material price than the iron pipe and more flexible by
using a combination of rubber pipe.
310
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik