Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
International
Book of Full Papers - Symposium Hydro Engineering
Page - 310 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 310 - in Book of Full Papers - Symposium Hydro Engineering

Image of the Page - 310 -

Image of the Page - 310 - in Book of Full Papers - Symposium Hydro Engineering

Text of the Page - 310 -

B. INSTALLATION OF BOOSTER PUMP AND FLOATING PIPE AS SUPPORT OF THE DREDGERS This method is used in order to support sediment flow from zone 1 near intake to spoilbank area with distance 1500-2000 m at 18 m height. Specifications of existing dredger with type Hydroland and Ellicot are only able to drain sediment optimally at a distance of +500 m with a capacity of + 70-100 m3 / h, so that additional booster is needed, while the previous pipeline using iron pipe and PVC pipe will be replaced by using HDPE floating pipe to be more efficient because of the cheaper material price than the iron pipe and more flexible by using a combination of rubber pipe. 310
back to the  book Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Title
Book of Full Papers
Subtitle
Symposium Hydro Engineering
Author
Gerald Zenz
Publisher
Verlag der Technischen Universität Graz
Location
Graz
Date
2018
Language
English
License
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Size
20.9 x 29.6 cm
Pages
2724
Keywords
Hydro, Engineering, Climate Changes
Categories
International
Naturwissenschaften Physik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers