1.4. The Challenges
There are many challenges to be faced in the implementation of projects
but right-of-way or resettlement was not an issue here; all of the work will be
done within the existing reservoir. That however, leads to the first challenge.
The work is to be done inside the reservoir where the water levels fluctuate
during the year from the wet to dry seasons. The construction window when it is
safe to work within the reservoir is a very limited window.
The second challenge is that the main closure dike is to be constructed on
very soft sedimentation deposits that have accumulated over the years to a depth
over 20m.
First Challenge – Construction Window
The first challenge, related to the water level, is when can construction start
and how long construction can continue until. As seen in the historic fluctuation
of water levels below, the timing of drawdown of the reservoir varies over several
months.
508
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik