Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
International
Book of Full Papers - Symposium Hydro Engineering
Page - 508 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 508 - in Book of Full Papers - Symposium Hydro Engineering

Image of the Page - 508 -

Image of the Page - 508 - in Book of Full Papers - Symposium Hydro Engineering

Text of the Page - 508 -

1.4. The Challenges There are many challenges to be faced in the implementation of projects but right-of-way or resettlement was not an issue here; all of the work will be done within the existing reservoir. That however, leads to the first challenge. The work is to be done inside the reservoir where the water levels fluctuate during the year from the wet to dry seasons. The construction window when it is safe to work within the reservoir is a very limited window. The second challenge is that the main closure dike is to be constructed on very soft sedimentation deposits that have accumulated over the years to a depth over 20m. First Challenge – Construction Window The first challenge, related to the water level, is when can construction start and how long construction can continue until. As seen in the historic fluctuation of water levels below, the timing of drawdown of the reservoir varies over several months. 508
back to the  book Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Title
Book of Full Papers
Subtitle
Symposium Hydro Engineering
Author
Gerald Zenz
Publisher
Verlag der Technischen Universität Graz
Location
Graz
Date
2018
Language
English
License
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Size
20.9 x 29.6 cm
Pages
2724
Keywords
Hydro, Engineering, Climate Changes
Categories
International
Naturwissenschaften Physik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers