Figure 10.
Primary Embankment Placement, Source : Hazama Ando-Wika JO Drone Photo
Figure 11.
Primary Embankment Spreading. Source: Nippon Koei Staff Photo
Step 3: Once the primary embankment was completed the soil cement was
placed and compacted layer by layer up to Elevation 132. While the warm-dry
winds have been very beneficial during the drying of the exposed reservoir soils
to support construction equipment, the same winds become a problem during the
mixing and placing of soil cement. Control of the moisture content of the soil
514
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik