Figure 10.
Primary Embankment Placement, Source : Hazama Ando-Wika JO Drone Photo
Figure 11.
Primary Embankment Spreading. Source: Nippon Koei Staff Photo
Step 3: Once the primary embankment was completed the soil cement was
placed and compacted layer by layer up to Elevation 132. While the warm-dry
winds have been very beneficial during the drying of the exposed reservoir soils
to support construction equipment, the same winds become a problem during the
mixing and placing of soil cement. Control of the moisture content of the soil
514
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik