Seite - 843 - in Book of Full Papers - Symposium Hydro Engineering
Bild der Seite - 843 -
Text der Seite - 843 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
TECHNICAL STAGE TO PLUG THE LARGE SIZE DIVERSION TUNNEL OF
JATIGEDE DAM AT WEST JAVA, REPUBLIC OF INDONESIA, 2017
Email: anwarmakmur@gmail.com; anwarmakmur@gmail.com;
toloose234@gmail.com ; always_rosita@yahoo.com
Anwar MAKMUR IR.,
Sr.Engineering Geologist,at Jatigede dam, West Java
Dony Faturochman SAEFULLOH, ST., MT.,
Head of Dam Planer at Jatigede dam, West Java
Tulus H. Basuki IR.,
Dam Designer at Jatigede Dam, West Java
Rosita. H. ST., MT.,
Hydrologist at Jatigede dam, West java
INDONESIA
1. ABSTRACT
Jatigede Dam is a rock fill dam located on Cimanuk river, West Java
province, Republic of Indonesia which is one of Multipurpose dam and second
biggest in Indonesia with 114 m height and about 980 Mcm of reservoir volume.
To perform the initial filling of the reservoir, the inlet of the diversion tunnel must
be closed and followed by plugging work. Systematically, Jatigede Dam diversion
structure with a diameter of 10 m, starting from Inlet Diversion Conduit along
843
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik