Fig. 11
Additional Outlet Tunnel
6. CONSTRUCTION PROGRESS
The construction of dam rehabilitation started on August 2017. The
construction schedule is 20 months so it will be completed on March 2019. The
construction is dam crest and spillway rehabilitation that cost is about 100 million
baht. In the first part of the schedule, the construction is RCC block and dam
crest removal. The photo of construction is shown in Figure 12.
Existing Outlet Additional Tunnel Outlet
894
Book of Full Papers
Symposium Hydro Engineering
- Titel
- Book of Full Papers
- Untertitel
- Symposium Hydro Engineering
- Autor
- Gerald Zenz
- Verlag
- Verlag der Technischen Universität Graz
- Ort
- Graz
- Datum
- 2018
- Sprache
- englisch
- Lizenz
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Abmessungen
- 20.9 x 29.6 cm
- Seiten
- 2724
- Schlagwörter
- Hydro, Engineering, Climate Changes
- Kategorien
- International
- Naturwissenschaften Physik
- Technik