Page - 40 - in Algorithms for Scheduling Problems
Image of the Page - 40 -
Text of the Page - 40 -
Algorithms 2018,11, 66
10. Braun,O.; Lai, T.-C.; Schmidt, G.; Sotskov, Y.N. Stability of Johnson’s schedulewith respect to limited
machineavailability. Int. J.Prod. Res. 2002,40, 4381–4400. [CrossRef]
11. Sotskov,Y.N.;Egorova,N.M.;Lai,T.-C.Minimizingtotalweightedflowtimeofasetof jobswith interval
processingtimes.Math.Comput.Model. 2009,50, 556–573. [CrossRef]
12. Sotskov,Y.N.; Lai, T.-C.Minimizing totalweightedflowtimeunderuncertaintyusingdominanceanda
stabilitybox.Comput.Oper. Res. 2012,39, 1271–1289. [CrossRef]
13. Graham,R.L.;Lawler,E.L.;Lenstra, J.K.;Kan,A.H.G.R.OptimizationandApproximation inDeterministic
SequencingandScheduling.Ann.Discret. Appl.Math. 1979,5, 287–326.
14. Smith,W.E.Variousoptimizers forsingle-stageproduction.Nav.Res. Logist.Q.1956,3, 59–66. [CrossRef]
15. Lai,T.-C.;Sotskov,Y.N.;Egorova,N.G.;Werner,F.Theoptimalitybox inuncertaindata forminimisingthe
sumof theweighted jobcompletiontimes. Int. J.Prod. Res. 2017. [CrossRef]
16. Burdett, R.L.; Kozan, E. Techniques to effectively buffer schedules in the face of uncertainties.
Comput. Ind. Eng.2015,87, 16–29. [CrossRef]
17. Goren,S.; Sabuncuoglu, I.Robustnessandstabilitymeasures forscheduling: Single-machineenvironment.
IIETrans. 2008,40, 66–83. [CrossRef]
18. Kasperski, A.; Zielinski, P. A 2-approximation algorithm for interval dataminmax regret sequencing
problemswith totalflowtimecriterion.Oper. Res. Lett. 2008,36, 343–344. [CrossRef]
19. Kouvelis,P.;Yu,G.RobustDiscreteOptimizationand ItsApplication;KluwerAcademicPublishers: Boston,
MA,USA,1997.
20. Lu,C.-C.;Lin,S.-W.;Ying,K.-C.Robustschedulingonasinglemachine totalflowtime.Comput.Oper. Res.
2012,39, 1682–1691. [CrossRef]
21. Yang, J.;Yu,G.Ontherobust singlemachineschedulingproblem. J.Comb.Optim. 2002,6, 17–33. [CrossRef]
22. Harikrishnan,K.K.; Ishii,H.Singlemachinebatchschedulingproblemwithresourcedependentsetupand
processingtimein thepresenceof fuzzyduedate.FuzzyOptim.Decis.Mak. 2005,4, 141–147. [CrossRef]
23. Allahverdi,A.;Aydilek,H.;Aydilek,A.Singlemachineschedulingproblemwith intervalprocessingtimes
tominimizemeanweightedcompletiontimes.Comput.Oper. Res. 2014,51, 200–207. [CrossRef]
c©2018bytheauthors. LicenseeMDPI,Basel,Switzerland. Thisarticle isanopenaccess
articledistributedunder the termsandconditionsof theCreativeCommonsAttribution
(CCBY) license (http://creativecommons.org/licenses/by/4.0/).
40
back to the
book Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Title
- Algorithms for Scheduling Problems
- Authors
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Editor
- MDPI
- Location
- Basel
- Date
- 2018
- Language
- English
- License
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Size
- 17.0 x 24.4 cm
- Pages
- 212
- Keywords
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Categories
- Informatik
- Technik