Algorithms 2018,11, 43
establish that job Jj (j = 0) either occupies theļ¬rst position (after J0) or is necessarilyprecededby
another job. The constraints in Equation (8) ensure that one job, atmost, immediately precedes
another. Theexpressions inEquation(9)deļ¬nethatall the jobsarereadytobe initiatedonmachine
M1, that is thecompletion timeforall jobs in thedummymachine (k=0) iszero,andsoensure the
consistencyoftherestrictionsinEquation(3). TheexpressionsinEquations(10)ā(12)deļ¬nethedomain
of thevariables.
Themodelās size inrelationto itsnumbersofvariablesandconstraintsarepresented inTable1.
Forexample,an instancewithn=5 jobsandm=3machineshas69variablesand91constraintsand
anotheronewithn=10 jobsandm=5machineshas236variablesand268constraints.
Table1.Modelās size inrelationtonumbersofvariablesandconstraints.
Variables Binary n2 +2n
Integer n2 +m+n+1
Total n(2n+3)+m+1
Constraints (2) n2m+nm
(3) nm
(4) n
(5) n
(6) 1
(7) n
(8) n+1
(9) n+1
Total n(n+2m+6)+m+3
4.ConstructiveHeuristics
Toefļ¬ciently solve theproblemdescribed inSection3, tenconstructiveheuristicmethodsare
proposed based on an investigation of the problem structure and inspired by relevant classical
algorithms, suchas theNEHheuristic [17],Hodgsonāsalgorithm[18]andwell-knownpriorityrules,
such as the EDDwhich is the ascending order of duedates, and theminimumslack time (MST)
whichsequences jobsaccording to thesmallestamountof slack (djāāmk=1pjk). It isknownthat, in
asingle-machineproblem, theEDDandMSTrulesminimize themaximumtardinessandearliness,
respectively [19].
All theheuristics requirea timingadjustmentprocedure thatconsistsof checkingthebest instant
tostart theoperations foragivensequence tocompleteagreaternumberof jobsontime. Thesimple
shiftingofanearly jobwithaslacktimetomatchitsconclusiontoitsduedatecouldresult inanoverall
improvement inthesolution.Apseudo-codeof thetimingadjustmentprocedure isgiveninAlgorithm
1.Note thatashift isappliedonly in the lastoperationofa job(Step3 inAlgorithm1)becausekeeping
eachpreviousoperationstartingat itsearliestpossible instantcanbeanadvantage in thisproblemas
it enables jobs that couldbe latebecauseof theirļ¬rstoperations tobeanticipated. Inaddition, this
shift ismaintainedwhen there is an improvement in the solution (or at least a tie); otherwise, the
replacement is reversedtoanticipateoperationswhichcontribute toeliminatingpossible tardiness in
subsequent jobs.
Timingadjustmentprocedure
Step1. For thegivensequence, consideringstartingeachoperationasearlyaspossible, compute the
numberof just-in-time jobs (nJIT) andconsider Jinitial = J[1],where J[j] is the job inposition jof
thesequence.
Step2. From Jinitial, identify theļ¬rst early job in the sequence (JE) andgo toStep3. If thereareno
early jobs (from Jinitial), STOP.
Step3. Movethe lastoperationof job JE toeliminateearlinessandmake itsconclusioncoincidewith
itsduedate. Properlyreschedule the lastoperationsof the jobsafter JE.
61
back to the
book Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Title
- Algorithms for Scheduling Problems
- Authors
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Editor
- MDPI
- Location
- Basel
- Date
- 2018
- Language
- English
- License
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Size
- 17.0 x 24.4 cm
- Pages
- 212
- Keywords
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Categories
- Informatik
- Technik