Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
Informatik
Algorithms for Scheduling Problems
Page - 95 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 95 - in Algorithms for Scheduling Problems

Image of the Page - 95 -

Image of the Page - 95 - in Algorithms for Scheduling Problems

Text of the Page - 95 -

Algorithms 2018,11, 68 15. May,G.; Stahl, B.; Taisch,M.; Prabhu,V.Multi-objectivegenetic algorithm for energy-efficient job shop scheduling. Int. J.Prod. Res. 2015,53, 7071–7089. [CrossRef] 16. Zhang,R.;Chiong,R.Solvingtheenergy-efficient jobshopschedulingproblem:Amulti-objectivegenetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. J.Clean. Prod. 2016,112, 3361–3375. [CrossRef] 17. Mouzon,G.;Yildirim,M.B.;Twomey, J.Operationalmethodsforminimizationofenergyconsumptionof manufacturingequipment. Int. J.Prod. Res. 2007,45, 4247–4271. [CrossRef] 18. Dai,M.;Tang,D.;Giret,A.;Salido,M.A.;Li,W.D.Energy-efficient schedulingforaflexibleflowshopusing an improvedgenetic-simulated annealing algorithm. Robot. Comput. Integr. Manuf. 2013, 29, 418–429. [CrossRef] 19. Mansouri, S.A.; Aktas, E.; Besikci,U.Green schedulingof a two-machineflowshop: Trade-off between makespanandenergyconsumption.Eur. J.Oper. Res. 2016,248, 772–788. [CrossRef] 20. Hecker,F.T.;Hussein,W.B.;Paquet-Durand,O.;Hussein,M.A.;Becker,T.Acasestudyonusingevolutionary algorithmstooptimizebakeryproductionplanning.ExpertSyst.Appl. 2013,40, 6837–6847. [CrossRef] 21. Hecker,F.T.; Stanke,M.;Becker,T.;Hitzmann,B.ApplicationofamodifiedGA,ACOandarandomsearch procedure tosolve theproductionschedulingofacasestudybakery.ExpertSyst.Appl. 2014,41, 5882–5891. [CrossRef] 22. Fonseca, C.M.; Fleming, P.J. An overview of evolutionary algorithms in multiobjective optimization. Evol.Comput. 1995,3, 1–16. [CrossRef] 23. Hosseinabadi,A.A.R.; Siar,H.; Shamshirband, S.; Shojafar,M.;Nasir,M.H.N.M.Using thegravitational emulation local searchalgorithmtosolve themulti-objectiveflexibledynamic jobshopschedulingproblem inSmallandMediumEnterprises.Ann.Oper. Res. 2015,229, 451–474. [CrossRef] 24. Deb,K.;Pratap,A.;Agarwal,S.;Meyarivan,T.Afastandelitistmultiobjectivegeneticalgorithm:NSGA-II. IEEETrans. Evol. Comput. 2002,6, 182–197. [CrossRef] 25. Jaimes,A.L.;Coello,C.A.C. InteractiveApproachesApplied toMultiobjectiveEvolutionaryAlgorithms. InMulticriteriaDecisionAidandArtificial Intelligence;Doumpos,M.,Grigoroudis,E.,Eds.; JohnWiley&Sons, Ltd.: Chichester,UK,2013. [CrossRef] 26. Lu,L.;Anderson-Cook,C.;Lin,D.Optimaldesignedexperimentsusingapareto frontsearchfor focused preferenceofmultipleobjectives.Comput. Stat.DataAnal. 2014,71, 1178–1192. [CrossRef] 27. Wagner,T.;Trautmann,H. Integrationofpreferences inhypervolume-basedmultiobjectiveevolutionary algorithmsbymeansofdesirability functions. IEEETrans. Evol. Comput. 2010,14, 688–701. [CrossRef] 28. Baker,K.R. Introduction toSequencingandScheduling; JohnWiley&Sons,Ltd.:NewYork,NY,USA,1974. 29. Pinedo,M.Scheduling: Theory,Algorithms, andSystems;PrenticeHall:UpperSaddleRiver,NJ,USA,2002; 586p. 30. Abyaneh,S.H.;Zandieh,M.Bi-objectivehybridflowshopschedulingwithsequence-dependentsetuptimes andlimitedbuffers. Int. J.Adv.Manuf. Technol. 2012,58, 309–325. [CrossRef] 31. Graham,R.L.;Lawler,E.L.;Lenstra, J.K.;Kan,A.H.G.R.Optimizationandapproximation indeterministic sequencingandscheduling:Asurvey.Ann.Discret.Math. 1979,5, 287–326. [CrossRef] 32. Larrañaga,P.;Kuijpers,C.M.H.;Murga,R.H.; Inza, I.;Dizdarevic,S.Geneticalgorithmsfor the travelling salesmanproblem:Areviewofrepresentationsandoperators.Artif. Intell. Rev. 1999,13, 129–170. [CrossRef] 33. Tan,K.C.;Lee,L.H.;Zhu,Q.L.;Ou,K.Heuristicmethods forvehicle routingproblemwith timewindows. Artif. Intell. Eng. 2001,15, 281–295. [CrossRef] 34. Gog,A.; Chira,C.ComparativeAnalysis of RecombinationOperators inGeneticAlgorithms for the Travelling SalesmanProblem; Springer: Berlin/Heidelberg,Germany,2011;pp.10–17. 35. Hwang,H.Animprovedmodel forvehicleroutingproblemwithtimeconstraintbasedongeneticalgorithm. Comput. Ind. Eng. 2002,42, 361–369. [CrossRef] 36. Prins,C.Asimpleandeffectiveevolutionaryalgorithmfor thevehicle routingproblem.Comput.Oper. Res. 2004,31, 1985–2002. [CrossRef] 37. Starkweather,T.;McDaniel, S.;Mathias,K.E.;Whitley,C.Acomparisonofgenetic sequencingoperators. InProceedingsof the4thInternationalConferenceonGeneticAlgorithms;Belew,R.K.,Booker,L.B.,Eds.; MorganKaufmann: SanFrancisco,CA,USA,1991;pp.69–76. 38. TheRProject forStatisticalComputing.Availableonline: https://www.r-project.org/(accessedon4March 2017). 95
back to the  book Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Title
Algorithms for Scheduling Problems
Authors
Frank Werner
Larysa Burtseva
Yuri Sotskov
Editor
MDPI
Location
Basel
Date
2018
Language
English
License
CC BY 4.0
ISBN
978-3-03897-120-7
Size
17.0 x 24.4 cm
Pages
212
Keywords
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Categories
Informatik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems