Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
Informatik
Algorithms for Scheduling Problems
Page - 163 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 163 - in Algorithms for Scheduling Problems

Image of the Page - 163 -

Image of the Page - 163 - in Algorithms for Scheduling Problems

Text of the Page - 163 -

Algorithms 2018,11, 57 3. Dolgui, A.; Proth, J.-M. Supply Chains Engineering: Useful Methods and Techniques; Springer: Berlin, Germany,2010. 4. Werner,F.; Sotskov,Y. (Eds.)SequencingandSchedulingwith InaccurateData;NovaPublishers:NewYork,NY, USA,2014. 5. Lauff,V.;Werner, F.On theComplexity andSomeProperties ofMulti-Stage SchedulingProblemswith EarlinessandTardinessPenalties.Comput.Oper. Res. 2004,31, 317–345. [CrossRef] 6. Jungwattanakit, J.;Reodecha,M.;Chaovalitwongse,P.;Werner,F.Acomparisonofschedulingalgorithms forflexibleflowshopproblemswithunrelatedparallelmachines, setuptimes,anddualcriteria.Comput. Oper. Res. 2009,36, 358–378. [CrossRef] 7. Dolgui,A.;Kovalev,S.Min-MaxandMin-MaxRegretApproaches toMinimumCostToolsSelection4OR-Q. J.Oper. Res. 2012,10, 181–192. [CrossRef] 8. Dolgui,A.;Kovalev,S.ScenarioBasedRobustLineBalancing: ComputationalComplexity.Discret. Appl. Math. 2012,160, 1955–1963. [CrossRef] 9. Sotskov,Y.N.;Lai,T.-C.;Werner,F.MeasuresofProblemUncertainty forSchedulingwithIntervalProcessing Times.ORSpectr. 2013,35, 659–689. [CrossRef] 10. Choi, T.-M.; Yeung, W.-K.; Cheng, T.C.E. Scheduling and co-ordination of multi-suppliers single- warehouse-operatorsingle-manufacturersupplychainswithvariableproductionratesandstoragecosts. Int. J.Prod. Res. 2013,51, 2593–2601. [CrossRef] 11. Harjunkoski, I.;Maravelias,C.T.;Bongers,P.;Castro,P.M.;Engell,S.;Grossmann, I.E.;Hooker, J.;Méndez,C.; Sand,G.;Wassick, J.Scopeforindustrialapplicationsofproductionschedulingmodelsandsolutionmethods. Comput. Chem.Eng. 2014,62, 161–193. [CrossRef] 12. Boz˙ek, A.; Wysocki,M. Flexible Job ShopwithContinuousMaterial Flow. Int. J. Prod. Res. 2015, 53, 1273–1290. [CrossRef] 13. Ivanov,D.; Dolgui, A.; Sokolov, B. Robust dynamic schedule coordination control in the supply chain. Comput. Ind. Eng. 2016,94, 18–31. [CrossRef] 14. Giglio,D.Optimalcontrol strategies forsingle-machine familyschedulingwithsequence-dependentbatch setupandcontrollableprocessingtimes. J.Sched. 2015,18, 525–543. [CrossRef] 15. Lou,S.X.C.;VanRyzin,G.Optimalcontrol rules forscheduling jobshops.Ann.Oper. Res. 1967,17, 233–248. [CrossRef] 16. Maimon,O.;Khmelnitsky,E.;Kogan,K.OptimalFlowControl inManufacturingSystems; Springer: Berlin, Germany,1998. 17. Ivanov,D.; Sokolov, B.Dynamic coordinated scheduling in themanufacturing systemunder a process modernization. Int. J.Prod. Res. 2013,51, 2680–2697. [CrossRef] 18. Pinha,D.;Ahluwalia,R.;Carvalho,A.ParallelModeScheduleGenerationScheme. InProceedingsof the 15th IFACSymposiumonInformationControlProblems inManufacturingINCOM,Ottawa,ON,Canada, 11–13May2015. 19. Ivanov,D.;Sokolov,B.Structuredynamicscontrolapproachtosupplychainplanningandadaptation. Int. J. Prod. Res. 2012,50, 6133–6149. [CrossRef] 20. Ivanov, D.; Sokolov, B.; Dolgui, A. Multi-stage supply chains scheduling in petrochemistry with non-preemptiveoperationsandexecutioncontrol. Int. J.Prod. Res. 2014,52, 4059–4077. [CrossRef] 21. Pontryagin,L.S.;Boltyanskiy,V.G.;Gamkrelidze,R.V.;Mishchenko,E.F.TheMathematicalTheoryofOptimal Processes;PergamonPress:Oxford,UK,1964. 22. Athaus,M.; Falb, P.L.Optimal Control: An Introduction to the Theory and Its Applications; McGraw-Hill: NewYork,NY,USA;SanFrancisco,CA,USA,1966. 23. Lee,E.B.;Markus,L.FoundationsofOptimalControlTheory;Wiley&Sons:NewYork,NY,USA,1967. 24. Moiseev,N.N.Elementof theOptimalSystemsTheory;Nauka:Moscow,Russia,1974. (InRussian) 25. Bryson,A.E.;Ho,Y.-C.AppliedOptimalControl;Hemisphere:Washington,DC,USA,1975. 26. Gershwin,S.B.ManufacturingSystemsEngineering;PTRPrenticeHall: EnglewoodCliffs,NJ,USA,1994. 27. Sethi, S.P.;Thompson,G.L.OptimalControlTheory:Applications toManagementScienceandEconomics, 2nded.; Springer: Berlin,Germany,2000. 28. Dolgui,A.; Ivanov,D.;Sethi,S.; Sokolov,B.Scheduling inproduction, supplychain Industry4.0systemsby optimalcontrol: fundamentals, state-of-the-art, andapplications. Int. J.Prod. Res. 2018, forthcoming. 29. Bellmann,R.AdaptiveControlProcesses: AGuidedTour;PrincetonUniversityPress: Princeton,NJ,USA,1972. 163
back to the  book Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
Title
Algorithms for Scheduling Problems
Authors
Frank Werner
Larysa Burtseva
Yuri Sotskov
Editor
MDPI
Location
Basel
Date
2018
Language
English
License
CC BY 4.0
ISBN
978-3-03897-120-7
Size
17.0 x 24.4 cm
Pages
212
Keywords
Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
Categories
Informatik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Algorithms for Scheduling Problems