Page - 179 - in Algorithms for Scheduling Problems
Image of the Page - 179 -
Text of the Page - 179 -
Algorithms 2018,11, 35
19. Tillman,P.AnAnalysisof theEffectof theEnterpriseRiskManagementMaturityonSharehokderValueduring
theEconomicDownturnof2008–2010.Master’sThesis,UniversityofPretoria,Pretoria,SouthAfrica,2011.
20. Shannon,C.E.AMathematicalTheoryofCommunication.BellSyst. Tech. J.1948,27, 379–423. [CrossRef]
21. Wentzel,E.S.ProbabilityTheory;MirPublishers:Moscow,Russia,1982.
22. Fruggiero, F.; Riemma, S.;Ouazene,Y.;Macchiaroli, R.; Guglielmim,V. Incorporating thehuman factor
within themanufacturingdynamics. IFAC-PapersOnline2016,49, 1691–1696. [CrossRef]
©2018bytheauthors. LicenseeMDPI,Basel,Switzerland. Thisarticle isanopenaccess
articledistributedunder the termsandconditionsof theCreativeCommonsAttribution
(CCBY) license (http://creativecommons.org/licenses/by/4.0/).
179
back to the
book Algorithms for Scheduling Problems"
Algorithms for Scheduling Problems
- Title
- Algorithms for Scheduling Problems
- Authors
- Frank Werner
- Larysa Burtseva
- Yuri Sotskov
- Editor
- MDPI
- Location
- Basel
- Date
- 2018
- Language
- English
- License
- CC BY 4.0
- ISBN
- 978-3-03897-120-7
- Size
- 17.0 x 24.4 cm
- Pages
- 212
- Keywords
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Categories
- Informatik
- Technik