3.5. FLOOD ROUTING
The result of flood design on Sengguruh Dam then calculated by flood
routing in Q1000 th and QPMF to obtain outflow value from Sengguruh Dam
(from spillway & turbine). The outflow result from Sengguruh Dam is then used as
inflow discharge value for the calculation of river routing (Sengguruh-Sutami).
The result value from river routing then combined with flood design from
Remaining Basin Sutami to get the inflow value at Sutami Dam. The result of
flood design in Lahor Dam then calculated by flood routing to obtain the outflow
value at Lahor Dam.
The inflow value of Sutami Dam then calculated by flood routing in Sutami
reservoir by considering the in/out discharge from connection tunnel and
discharge from hydroelectrical power plant of Sutami. The flood routing also
considered the water level on PMF discharge so that the reservoir can still reduce
the flood that occurred. Graphical representation of the calculations result can be
viewed in “fig 8 and 9”.
In order to obtain safety to manage at Sutami and Lahor Dam on possibility
of overtopping caused by PMF discharge in the rainy season, the operation of
Sutami and Lahor reservoir need to consider the application of CWL at elevation
between +257,00 m to +267.00 m.
Fig. 8
Water Level Elevation of PMF Discharge
228
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik