Fig. 9
Water Level Elevation of PMF Discharge with CWL application
3.6. SUMMARY
In hydrology analysis of the annual PMF discharge that potential to occur in
the Sutami Dam is very large at 11,629.14 m3/s, where the PMF discharge value
is equivalent to 2.31 x Q1000 years and with the parapet wall as high as 1 m at the
top of the dam and CWL management at elevation between + 257.00 m up to
+267.00 m still have 3 times potential of overtopping with water level 3.09 m
above the top of the dam. The annual PMF flood discharge that potentially occurs
in the Lahor Dam is very large at 2,731.00 m3/s, where the discharge value is
equivalent to 2.70 x Q1000 years and with the parapet wall as high as 1 m and with
CWL management at elevation between +257.00 m up to +267.00 m is not
potentially overtopping. The CWL in the Sutami and Lahor reservoirs is difficult to
applied because the dams function is to collect water in the rainy season and
utilize it during the dry season so that in order to anticipate the possibility of
overtopping, emergency spillway is needed to build at the Sutami Dam.
Keyword : Flood Control, Overtopping, Reservoir Operation, Water Level
229
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik