Text of the Page - 285 -

Table 5 Flushing Cost Calculation Discription Unit Volume Unit Price (Rp) Amount (Rp) Sediment FLushing = 350,865 m3 Loss of Water Service Fee (kWh) 969,000 167.0 161,823,000 Loss of Electricity Service (kWh) 969,000 1,352 1,310,088,000 Cost of Flushing Implementation Lump sum 1 133,330,000 133,330,000 Damage of Water Resource Infrastructure - Total Cost of Flushing 1,605,241,000 Table 6 Dredging Cost Calculation Description Explanation A. Land Acquisition Cost Land acquisition Rp 290,000/m2 Spoil bank can accommodate sediments 10 m high Land Acquisition Cost = 290,000 / 10 = Rp 29,000 / m3 Spoilbank Embankment Construction For the sediments of 1 m3 the volume of spoil bank embankment is = 1/3 = 0.333 m3 Unit price of embankment is Rp 40,930 / m3 Calculation see attachment 1 Spoil bank embankment construction cost = 0.333 x 40,930 = Rp 13,630 / m3 Sediment Dredging Costs Sediment dredging cost = Rp 64,100 / m3 Calculation see attachment 2 Dredging with Spoil Bank Disposal Costs = A + B + C = Rp 106,730 / m3 For dredging of 350.865 m3 of sediment cost = 350,865 x106,730 = Rp 37,454,838,750 Dredging with Riverine Disposal to Channel Below Costs = C = Rp 64,100 / m3 For dredging of 350.865 m3 of sediment cost = 350,865 x 64,100 = Rp 22,490,446,500 From the above table it can be concluded that flushing implementation is more effective than dredging. Flushing can save the cost of Rp. 35.85 billion (Rp 37,454,838,750 – Rp 1,605,241,000) compared to dredging with spoil bank disposal, while dredging with riverine disposal to channel below can save about Rp. 14.96 billion (Rp 37,454,838,750 – Rp 22,490,446,500) compared to the dredging with spoil bank disposal. 285
back to the  book Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Title
Book of Full Papers
Subtitle
Symposium Hydro Engineering
Author
Gerald Zenz
Publisher
Verlag der Technischen Universität Graz
Location
Graz
Date
2018
Language
English
License
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Size
20.9 x 29.6 cm
Pages
2724
Keywords
Hydro, Engineering, Climate Changes
Categories
International
Naturwissenschaften Physik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers