Page - 308 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 308 -
Text of the Page - 308 -
limited operational range (both depth & discharge),and to reduce length of
dredging pipelines. Shortly, this condition is not good for keeping high
hydropower productivity which affected much of zone 1 condition.
Figure 5. General Plan Dredging Work on Current Condition
Travaux de dragage du plan général sur l'état actuel
3.3. DEVELOPMENT PLANNING OF DREDGING WORK TO RECOVERY
HYDROPOWER PRODUCTIVITY
The dredging method in 2016 was changed in order to make the dredging
of sediment can be implemented more effectively and efficiently to ensure high
hydropower production, maintain effective storage capacity and prolong age of
reservoir. The development planning are (a) with the combination of 2 dredging
types using available dredgers and additional heavy equipment (amphibious
excavators) to take out sediment which located at positions could not be done by
dredgers (dry-wet excavation), (b) installation of booster pump and floating pipe
as support of the dredgers, (c) modification of dredger ladder, (d) management of
spoilbank by re-arrange of hauling and reloading cycles, and accelerate sediment
material drying by installing vertical-horizontal drainage.
Dredging Zone
500-600 m
Spoilbank Area
Hydropower
Intake
308
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik