RESERVOIR OPERATION RULE OF HEPP POSO DAM, INDONESIA
Cristina D. YULININGTYAS
Dam Engineer, Dam Safety Unit, MINISTRY OF PUBLIC WORKS AND HOUSING
Rahman H. ARDIANSYAH
Dam Engineer, Dam Safety Unit, MINISTRY OF PUBLIC WORKS AND HOUSING
INDONESIA
1. INTRODUCTION
The areas that rapidly increase the electricity demand in Indonesia are South Sulawesi and
Central Sulawesi. these regions have potential electric power with Central Sulawesi
electrification ratio reached 48.3%. Based on the potential, will be built hydro electric power
Poso-1 dam located in the Saojo village, North Pamona, Poso, Central Sulawesi.
This hydropower in addition to serve the needs of the area around the project (Central
Sulawesi), are also expected to support the electricity needs throughout Sulawesi,
particularly the mining industry spread across South and Southeast Sulawesi.
2. ELECTRICAL SYSTEM IN CENTRAL SULAWESI
Up to the third quarter of 2014, the electrical system of Central Sulawesi Province is supplied
by power plant generator centers, diesel and hydropower with total installed capacity is 314
MW with the composition of the plant is still dominated by diesel-fueled HSD amounted to
224.1 MW, or 71 % of total generating capacity, followed by hydropower for 63 MW or 20%
of the total generating capacity of 27 MW and a power plant or 9% of total generating
capacity. With the completion of construction of 150 kv transmission network Poso-Palu will
maximize the evacuation of power from Poso hydropower electricity system, Central
Sulawesi.
2.1. Electricity Projection Needs in Central Sulawesi
With the implementation of Special Economic Zones (SEZ) in the Palu city, in the future
economy of Central Sulawesi will certainly increase. Almost all sectors of the economy will
grow up. In order SEZ can running well, the electricity supply needs to be strengthened in
order to support the Government's program. Based on electricity sales data within 5 (five)
years and taking into account regional economic growth trends including the regional
industry, population growth and increased electrification ratio on future, the projected
demand for electricity from 2015 to 2024 can be seen in the following table:
400
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik