Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
International
Book of Full Papers - Symposium Hydro Engineering
Page - 407 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 407 - in Book of Full Papers - Symposium Hydro Engineering

Image of the Page - 407 -

Image of the Page - 407 - in Book of Full Papers - Symposium Hydro Engineering

Text of the Page - 407 -

4. CONCLUSION Based on the results of hydropower potential investigation and analysis in Central Sulawesi shows that: - The potential for hydropower development in Sulawesi stored is still very large. - Poso hydropower development can improve the welfare of people especially in the Centre Sulawesi. 5. ACKNOWLEDGEMENT The authors would like to thank to Dam Safety Unit, Directorate General of Water Resources, Ministry of Public Works and Housing and also Poso-1 HEPP company for the authorization to publish the main result of the present study. Keywords: Reservoir Operasion Rule, Poso Dam, Hydropower Plant REFERENCES [1] Ministry of Housings and Infrastructures. Operation and Maintenance Management, Volume 2, Guideline of Dam Operation, Maintenance and Survailance, 2003. [2] PT. Poso Energy Satu Pamona. Feasibility Study, Poso-1 HEPP Stage 1 (4 x 30 MW) and Regulating Dam, 2016. [3] PT. Poso Energy Satu Pamona. Detailed Design, Supporting Report – Hydrology, Poso- 1 HEPP (4 x 30 MW) and Regulating Dam, 2016. 407
back to the  book Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Title
Book of Full Papers
Subtitle
Symposium Hydro Engineering
Author
Gerald Zenz
Publisher
Verlag der Technischen Universität Graz
Location
Graz
Date
2018
Language
English
License
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Size
20.9 x 29.6 cm
Pages
2724
Keywords
Hydro, Engineering, Climate Changes
Categories
International
Naturwissenschaften Physik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers