Page - 407 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 407 -
Text of the Page - 407 -
4. CONCLUSION
Based on the results of hydropower potential investigation and analysis in Central Sulawesi
shows that:
- The potential for hydropower development in Sulawesi stored is still very large.
- Poso hydropower development can improve the welfare of people especially in the Centre
Sulawesi.
5. ACKNOWLEDGEMENT
The authors would like to thank to Dam Safety Unit, Directorate General of Water
Resources, Ministry of Public Works and Housing and also Poso-1 HEPP company for the
authorization to publish the main result of the present study.
Keywords: Reservoir Operasion Rule, Poso Dam, Hydropower Plant
REFERENCES
[1] Ministry of Housings and Infrastructures. Operation and Maintenance Management,
Volume 2, Guideline of Dam Operation, Maintenance and Survailance, 2003.
[2] PT. Poso Energy Satu Pamona. Feasibility Study, Poso-1 HEPP Stage 1 (4 x 30 MW)
and Regulating Dam, 2016.
[3] PT. Poso Energy Satu Pamona. Detailed Design, Supporting Report – Hydrology, Poso-
1 HEPP (4 x 30 MW) and Regulating Dam, 2016.
407
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik