Page - 610 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 610 -
Text of the Page - 610 -
The dam has been built in the period 1955 – 57 on behalf of SADE
(Società Adriatica di elettricità ) and transferred to ENEL (Ente Nazionale per
l’Energia Elettrica) on March 1963.
In the following picture we can appreciate the dam shape during con-
struction.
Fig. 3
Ambiesta dam (during construction)
Ambiesta barrage (pendant la construction)
2.1.1. Area to be dredged
A2A, the Public Company, responsible for management of Ambiesta
reservoir, during the last years has monitored the sedimentation in the res-
ervoir and more in detail sedimentation rate close to the dam structure,
through a comparison of several topographic campaigns, to understand the
evolution sedimentation phenomenon, and its impact to ancillary structures
of the dam (dam bottom outlet and water intake), in terms of efficiency and
safety.
On basis of this monitoring, A2A noticed that the quantity of sediments,
coming from the rain activity on the surfaces of the catchment basin, reached
610
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik