SUSTAINABLE DEVELOPMENT IN HYDROPOWER PROJECT
Min Byeong Soo
Chief Executive Officer, Mira Power Limited
Pakistan
Hong Young Jin
General Manager (Admin & HR), Mira Power Limited
Pakistan
Nadim Ullah
Senior Manager (Admin & HR), Mira Power Limited
Pakistan
1. INTRODUCTION
Korea Energy (KOEN) is a leading state owned generation company of Republic
of Korea which owns and maintains 13.1% (10,329MW) of total generation
capacity of Korea.
To comply with KOEN “Vision 2025” regarding adding of green and clean energy
to the grid, KOEN acquired Mira Power Limited on mutual benefit basis where
Pakistan was facing acute shortage of energy.
Mira Power Limited, a subsidiary of Korea Energy (KOEN) is a special purpose
company, setup to design, construct, own, operate and maintain 102 MW Gulpur
hydro power plant as shown in Fig. 1 under Government of Pakistan’s Policy for
Power Generation Projects 2002 as adopted in Azad Jammu & Kashmir,
Pakistan. The Project “Gulpur Hydropower” is administratively located in Kotli
district, Azad Jammu & Kashmir, Pakistan at latitude 33°27’48.99" and longitude
73°51’48.99", about five Km south of Kotli Town on the Poonch River, a tributary
of Jhelum River. The site is about 167 Km from Islamabad and 285 Km from
Lahore as shown in Fig. 2.
654
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik