Page - 769 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 769 -
Text of the Page - 769 -
Site infrastructure: smooth and efficient construction process depend on a
workable site infrastructure. Investing in service roads to shorten the paths for
material handling or even the investment into an on-site concrete plant is positively
impacting the final concrete result.
Quality demand: matching and assuring the exact concrete quality demand
can have a major impact on the project budget. Reviewing the demand in an early
phase provides the possibility to consider the measures to be taken in the
execution phase.
Minimize risks: concrete joints or block joints pear a risk in regards to sealed
joints and water tightness. Uncontrolled heat development in mass concrete may
cause concrete cracking. In all event it will result in an impact on the project budget
for repair works and maintenance. Also it may influence the durability and the
service life of the dam structure. Optimize the volume of mass concrete with the
corresponding pouring sequence in combination of concrete monitoring equals
minimizing risks of unexpected costs.
Figure 9: Wudongde Dam, China
769
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik