Page - 882 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 882 -
Text of the Page - 882 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
MAE SUAI DAM SAFETY
1. Mr. Pronmongkol Chidchob, Royal Irrigation Department
2. Mr.Worawut Pintabutr ; Samart Engineering Consultants Co.,Ltd.
3. Mr.Surachai Laikarnchanapaiboon ; Panya Consultants Co.,Ltd.
THAILAND
1. INTRODUCTION
Mae Suai is the second RCC dam in Thailand which is situated in Chaing
Rai province, in the northern region as shown in Figure 1. It was constructed on
the Mae Suai river during 1999 and 2002 for irrigation. The storage capacity is 73
Million cubic meter. The dam is a composite dam consisting of the RCC dam in
the middle part of the dam to be the spillway and the earth dam on the both
abutments because of the foundation condition. View of Mae Suai Dam is shown
in Figure 2. The maximum height of dam is about 59 m and the crest length is
400 m. The site plan and section of dam as shown in Figure 3. The foundation of
the RCC was excavated to the sound rock. Grouting has been done as
necessary. The RCC section uses as an overflow spillway. The RCC section is
surrounded with the earth dam. The earth dam extends to both sides of the
abutment. Core trench has been excavated in the foundation and to the
abutments. There are RCC blocks on the crest of earth dam at the downstream
side because of earthfill volume and height of spillway’s downstream wall
reduction.
882
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik