Page - 892 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 892 -
Text of the Page - 892 -
[2] Examine the gate control system of the dam and appurtenant
structures .
[3] Check the conditions of dam foundation, the seepage of the
dam and the possibility of landslides in the reservoir area .
[4] Monitor and examine the abnormality of the dam and
appurtenant structures.
[5] In case that the water level in the reservoir cannot be controlled,
resulting in rapid overflow over the dam crest and the dam is likely to break down,
evacuation of people from the project area should be implemented immediately
as well as the notification of related agencies located at the downstream.
2] Earthquakes may impact dams and can cause unusual conditions to
the dams. In case of earthquakes, the inspection of the dams and appurtenant
structure conditions after the earthquakes is recommended.
Dam conditions and seismic response will be measured by using the
dam instruments, such as Survey Monument, Piezometer and Accelerograph,
which are already installed.
Normal Level: An earthquake takes place more than 200 km away
from the dam and does not certainly cause any effects to the stability of the dam.
Alert Level: An earthquake of magnitude and distance according to
ICOLD (1988), or an earthquake which causes ground acceleration at the
foundation and is severe enough to cause a few impacts to the dam, occurs ) for
example, the accelerograph responds the seismic waves of > 0.02g to <0.2g,
which does not cause damage to the dam.(
Alarm Level: The earthquake generates ground acceleration of
>0.2g at the dam foundation or the magnitude and the distance of the earthquake
from the dam according to Sadigh )1997(’s energy attenuation model causes the
ground acceleration of 0.2g at the dam foundation, which is serious enough to
cause damage to the dam.
3] In case of landslides in a reservoir, the inspection and the evaluation
of landslide locations and sizes is recommended, including the massive waves
that may cause overflow to the dam crest .Scrap, rock and soil mass which block
the water flow should be moved out .It is recommended to inform the dam safety
section to evaluate the damage of the dam and appurtenant structures.
5. DAM REHABILITATION
Moreover, Royal irrigation department decided to rehabilitate Mae Suai
dam. Repair works shall be able to solve the leakage problem and make the dam
to perform well with the future earthquake. The dam rehabilitation will be done in
two parts. First, the RCC blocks on the earth dam crest will be removed and
replaced by the flexible and vibration resistance structure. The GRS wall with the
cutoff sheet pile will be used as shown in Figure 10. GRS wall consists of
reinforce gabion. The gabion wall is anchored to the gabion in the opposite side
in order to provide additional confining pressure near the slope face and hence
892
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik