increasing the strength of compacted sand during the earthquake. Hot dipped
galvanized steel sheet pile will be placed on both side of the GRS wall. Sheet
piles will work as a water tightness barrier. In addition, it designed to minimize
lateral movement that may cause from the weight of new GRS wall to the exiting
soil below the cut level.
And the second is to build the 3 m diameter tunnel as the additional outlet
to control the water level for flood management. The existing outlet diameter is
1.5 m that is small and the maximum discharge is about 30 cms. It is difficult to
manage flood because the reservoir volume of Mae Suai Dam is less than the
average annual inflow. Adding the new outlet tunnel should be done as shown in
Figure 11. The maximum discharge capacity is about 100 cms that less than the
capacity of the downstream river.
Existing Rehabilitation (GRS Wall)
Fig. 10
Dam Crest Rehabilitation Detail
RCC Block
893
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik