On the other hand, in case of non-emergency, it's better not to lower down the
reservoirs water level too much to avoid excess concrete stress and crack,
especially arch dams, to which, the temperature load is a kind of particularly
sensitive load. In fact, majority loads of water thrust act on the higher part of arch
dams. The total water thrust of Xiaowan arch dam with the height of 294.5m
reaches 18 million tons. And half of the thrust act on the top 40m of the dam, while
the other half act on the bottom 250m height left. So the integral stability of
Xiaowan arch dam is enough safe after discharging to the designed emptying
ending water level even if there is still 139.5m water head left.
The safety of embankment contains dam slope stability and seepage stability.
When the anti-seepage is damaged, the seepage gradient of dam body behind
the anti-seepage can be significantly reduced while the downstream slope stability
been increased by lower the reservoirs water level, no matter earth core dam or
concrete faced rockfill dam (CFRD).
DAM OVERHAUL CONDITIONS
Foundation galleries are usually set up in concrete dams, especially high dams.
So the cracks in the upstream surface of dam body and seepage of dam
basement can be handled by grouting in the foundation galleries, without
emptying the reservoirs. However, some concrete dams developed cracks
penetrating from upstream surface to foundations, which caused dam uplift
pressures and leakage increase. In this case, the cracks have to be repaired by
emptying the reservoirs instead of grouting only, such as Konbrien arch dam in
Austria.
The key problem of embankment dams is overhauling conditions of anti-seepage
systems. For earth core dams with foundation galleries, the effects of
supplementary grouting under high water head are usually not good if the
anti-seepage systems are damaged. So it is need to lower the reservoirs water
level to reduce the seepage pressure and velocity in order to achieve good
grouting effect. For CFRD, the biggest challenge is how to overhaul the broken
seepage system. Clay blanket under the emptying ending water level is designed
to protect the anti-seepage systems. But there are still some problems. The
leakage position of Baiyun CFRD in Hunan province was just below the clay
blanket, so the reservoir has to be emptying and clay blanket be dug out to
overhaul the broken concrete face. Some research suggest that do not set clay
blanket on the concrete face for convenience of overhaul. In the near future, the
dam examine and overhauling may not be limited by the water depth along with
the development of intelligent robots and detection technologies in deep water.
COMBINATION OF EMPTYING AND DISCHARGE FACILITIES
Usually, the intakes of emptying facilities are set too low and do not used to
discharge flood or silt. Most of them are rarely used and have very few chances to
operate and be maintained. So they may not be able to operate in case of
emergency. Thus it should be considered to combine the emptying facilities and
953
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik