Web-Books
in the Austria-Forum
Austria-Forum
Web-Books
International
Book of Full Papers - Symposium Hydro Engineering
Page - 960 -
  • User
  • Version
    • full version
    • text only version
  • Language
    • Deutsch - German
    • English

Page - 960 - in Book of Full Papers - Symposium Hydro Engineering

Image of the Page - 960 -

Image of the Page - 960 - in Book of Full Papers - Symposium Hydro Engineering

Text of the Page - 960 -

Fig.1 Ir. H. Djuanda Dam To assist in the event of a shortage of supply from downstream through the power cord, two irrigation supply channels (hollow jet valve) are available on the eve of +49 m.dpl, see as “Fig 2 and Fig.3”. Based on the result of the year 2000, the volume of TMA +107 m.dpl (normal pool level) of 2.448 million m3 with the puddle area of 81.3 km2. The dam was built in 1957 and completed in 1967 on the Citarum River, with a catchment area of 4,500 km2, while the catchment area directly to the reservoir after the construction of Saguling and Cirata Dam in the upper reaches 380 km2. Ir. H. Djuanda dam is a multipurpose dam, function as a hydropower plant with installed capacity of 187.5 MW, flood control in Karawang regency and Bekasi district, irrigation for 242,000 hectares of rice field in north coast of West Java, water supply for brackish water fishery cultivation along the west coast of West Java covering an area of 20,000 hectares and tourism. Fig.2 Profile of the main Dam Ir. H. Djuanda 960
back to the  book Book of Full Papers - Symposium Hydro Engineering"
Book of Full Papers Symposium Hydro Engineering
Title
Book of Full Papers
Subtitle
Symposium Hydro Engineering
Author
Gerald Zenz
Publisher
Verlag der Technischen Universität Graz
Location
Graz
Date
2018
Language
English
License
CC BY-NC-ND 4.0
ISBN
978-3-85125-620-8
Size
20.9 x 29.6 cm
Pages
2724
Keywords
Hydro, Engineering, Climate Changes
Categories
International
Naturwissenschaften Physik
Technik
Web-Books
Library
Privacy
Imprint
Austria-Forum
Austria-Forum
Web-Books
Book of Full Papers