Page - 1139 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1139 -
Text of the Page - 1139 -
The preparations for the HPP chain construction took a long time, while over
the recent few years intensive analysis concerning the design and implementation
of the selected solutions took place. In the individual phases of construction, which
took several years, the runoff conditions gradually changed, therefore the previous
runoff conditions in the HPP impact area were analysed. Good cooperation with
the HPP design engineer and competent authorities was essential to identify
relevant or unfavourable scenarios of flood (and other) events to be investigated
hydraulically, and to review and evaluate the interim calculation results.
2. HYDRAULIC MODELLING – BREŽICE HPP
The advantage of numerical modelling over physical models is that it is easier
to change the geometry and boundary and operational conditions, but
unfortunately in the most complex cases it still does not achieve the necessary
robustness of results compared with physical models. Therefore, hybrid hydraulic
modelling (HHM) was used, which applies the manner of modelling
(physical/numerical) that is the most relevant in a particular case. In this case, we
applied conventional and distorted physical models for flood areas and various
structures, while for the numerical analyses of runoff conditions in the entire area
the combined one- and two-dimensional (1D-2D) software MIKE FLOOD was
used. The appropriate numerical simulation of the faster 1D flow in the Sava River
channel and the slower 2D flow in floodplains was achieved by an extensive
calibration in relation to the previous flood events and simulations of conditions in
the physical model. The 1D module applied allowed for simulation of the impact of
various structures and operational dynamics according to the temporal dynamics
of the flow from upstream areas. This enabled a hydraulic analysis of the situation
in the wider areas (the entire HPP impact zone) as well as modelling of immediate
areas (e.g. the construction pit area) and of individual structures (e.g. spillways).
To analyse the flow conditions in the HPP’s immediate areas during the
individual construction phases fully-2D modelling was applied, e.g. using the
hydraulic software tool CCHE2D [5], which allowed for detailed analyses of velocity
fields in critical areas. This tool is well calibrated, too; the same boundary
conditions were applied for the HPP’s immediate area as well, i.e. the flow
conditions from the wider site analysis using HHM. Such case in shown in Figure
3 where left, based on an orthophoto image, the immediate zone of the HPP
BreĹľice construction pit is shown, while on the right the numerical mesh of the
same area for 2D analyses is shown.
1139
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik