2.2. Limitation of the Matrix
Based on the Regulation, dam construction and management should be
implemented based on concepts of dam safety[2].The concept of dam safety shall
comprise of 3 (three) pillars (Fig. 4), namely: a. structural safety; b. operation,
maintenance and monitoring (surveillance); and c. emergency preparedness.
Fig. 4
Dam Safety Concept covered in Maturity Matrices
The maturity matrix primarily concerned with surveillance and emergency
preparedness points of the dam safety concept. The discussion will be
concentrated on the application of the matrix in Bengawan Solo RBO as the DMU
showing the significant progress in the application of the maturity matrices in dam
safety program.
3. ASSESSMENT
3.1. Result of self-assessment
Assessment of the performance of the DMU using the maturity
matrices have been done with preparing the supporting data in accordance with
the activities. The following self-assessment of on the DMU Bengawan Solo RBO
which have been carried out, the assessment is using component matrices which
[2] Article 3, The Ministerial Regulation Number 27/PRT//M/2015 Concerning Dam,
Ministry of Public Works and Housing, The Republic of Indonesia, 2015
1156
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik