All activities are arranged and in well-organized based on regular SOPs,
there is continuous reporting on the observation and maintenance of
spillway and outlets equipment. The purpose is to maintain the
performance of the spillway and outlets equipment that will contribute to the
safety of the dam and its reservoir. The works will include program
implementation of the spillway and outlet equipment, examination and
maintenance of spillway and outlet equipment to assess the condition and
reliability also functional testing of spillway and outlet equipment.
6. Component 6, Reservoir Operation, with its activities of: Operation
Protocols; Relationship with External Stakeholders; Debris Management
The score is: at a very good practice (level 4). The DMU of Bengawan Solo
RBO has prepared the rule curve for reservoir operation purpose as a
protocol and continuously recorded with a structured process as required in
the SOP of dam operation. The annual operation plan is prepared based on
rule curve and recommendation Basin Coordinating Team for the proposed
water requirement from the users. The Debris management is done as part
of maintenance works in accordance with SOP which has been made in
order to improve the performance of the dam and its reservoir that secure
on all the operating conditions.
7. Component 7, Dam and Spillway maintenance, with its activities of: Dam,
Reservoir and Access maintenance; Spillway and Outlet Structure
maintenance. The score is: at a good practice (level 3). UPB BBWS
Bengawan Solo has arranged the operation pattern of reservoir and has
been carried out recording with a structured process because it already has
SOP of dam operation. Waste management is done in accordance with
SOP that has been made the goal is to increase the implementation
of maintenance of the structure of the civil society and construction related
to the dam and its reservoir. Including structural maintenance or repairs,
erosion protection, control vegetation and drainage maintenance (drainage
surface and drainage relief internal). Including spillway and electrical outlets
that shows the function of the safety of the dam also electrical components
and mechanical.
8. Component 8, Review and Audit, with its activities of: Dam Safety Program
Audit; Dam Safety Program Reviews; Dam Safety Reviews; Flow Control
Equipment Reviews. The score is: at a good practice (level 3). The dam
safety program is prepared annually. As a part of the SOP, the
implementation and the program are regularly audited and reviewed by
DMU manager. While the dam safety review including the flow control
equipment being done in semiannual basis by the ministry and 5 years
basis for the major inspection by the Dam Safety Commission, not all
inspections have been implemented but have been included in the strategic
plan related to the implementation of the major dam inspection.
1159
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik