Page - 1241 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1241 -
Text of the Page - 1241 -
piezometer (1), which lies at the center line of the road, were almost the same
from the beginning of the construction of the left half of the wall until the end of
the monitoring activities. Hence, it could be concluded that after the construction
of the wall, there is no hydraulic gradient through the embankment, which in turn
means that there is no erosion due to seepage forces.
Fig. 6: The readings of the strain gages of direction (r) of pile P54
The readings of the inclinometers embedded in the bentonite piles
indicated its high flexibility because of the heave action of the pile after each
construction or loading activities. The bentonite piles experienced high lateral
displacement compared with the adjacent reinforced concrete pile.
The monitoring system succeeded in reflecting the effect of the presence of
hard and/or very soft soil deposit lenses within the soft clay layer on the
developed strains and stresses. Monitoring of the reinforced concrete piles
showed that they experienced small stresses compared with its ultimate capacity.
The shallow embedment of the reinforced concrete pile in the lower poorly
graded sand layer did not allow for any fixation or partial fixation of the pile in the
sand.
1241
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik