arises about the degree of dam and construction site safety during remedial works.
Relevant dam safety can be usually achieved only through the significant reservoir
level drawdown providing sufficient volume to trap potential flood arriving to the
reservoir during construction period. The drawdown temporarily harms reservoir
purposes like water supply, recreation, hydropower production etc.
This study contains careful examination of aspects and requirements related
to the dam safety during its reconstruction. The discussion on the proportion
between individual purposes and benefits of the dam is also carried out. The
experience with safety analysis during dam reconstruction is mentioned together
with the method used. Practical examples demonstrate individual potential conflicts
entering into analysis.
2. THE DEGREE OF DAM SAFETY DURING ITS RECONSTRUCTION
The safety issues during the reconstruction of the dam concern two aspects:
â the protection of the construction site during the flood;
â dam safety against its total collapse usually due to water erosion.
2.1. THE PROTECTION OF THE CONSTRUCTION SITE
The construction site protection concerns individual workplaces like spillway,
chute, stilling basin, upstream slope lining, dam crest etc. In a view of safety rate
these parts should be assessed individually. Some of them like repair of the dam
crest or spillway directly relate to overall dam safety (Section 2.2). For other
structures not influencing overall safety of the dam some guidance is given by [3].
As a rule cost-benefit analysis has to be performed in case of the threat of
significant losses, terms of construction site insurance against floods should be
taken into account too. Guidelines in [3] applied in the Czech Republic recommend
the following return period N of the flood for preliminary construction site protection:
đ =đ +1, [1]
where T is duration of the construction in years.
2.2. THE SAFETY AGAINST THE DAM FAILURE
The safety of the dam against its collapse during the remedial works should
be assessed considering:
â current dam safety;
â potential material losses due to dam break flood;
â potential loss of life.
1255
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen UniversitÀt Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik