Page - 1270 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1270 -
Text of the Page - 1270 -
Sixth, integrate all data and criteria in a multi criteria decision analysis
model and obtain the target plan.
Data Collection
Safety & Stability
Analyses
Inspection
Investigation Evaluate
Existing
Structure
Condition Define
Measure
Or
Remedy
Actions Estimate
Cost
Master Plan
Multi Criteria decision Analysis
MCDA
Define Criteria
Fig. 2
Flowchart of methodology for preparation of the MP
Organigramme de la méthodologie pour la préparation du PD
5. WORK DONE
5.1. EVALUATE CURRENT STATUS OF EXISTING STRUCTURES
5.1.1. Database
The starting point for evaluation of structures is the collection of basic
information about them, then compile in a database. The database was
composed of two parts. One part forms the constant or the static data that are
almost in need for no regular update, while the other part includes the dynamic
data that are in need for periodic update.
The static data portion included:
Hydraulic structure data (drawings, reports)
Structure geotechnical investigation (sections, reports, photos)
Historical events and main rehabilitations (reports, photos)
Social and environmental data (reports)
The dynamic data portion included:
Site visual inspection (reports, photos)
1270
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik