Page - 1299 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1299 -
Text of the Page - 1299 -
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
KEY CONSTRUCTION TECHNOLOGY OF 300M HIGH CORE WALL
ROCK-FILL DAM
Wu GAOJIAN
Chief engineer, SINOHYDRO BUREAU 5 CO., LTD
Fan PENG
Chief engineer of Branch Company, SINOHYDRO BUREAU 5 CO., LTD
Han XING
Assistant Chief engineer of Branch Company, SINOHYDRO BUREAU 5 CO.,
LTD
CHINA
ABSTRACT
As the high rock-fill dam being constructed to 300m, the dam anti-seepage
safety attracts much more attention. For the high rock-fill dam constructed at the
place where the overburden is deep and the river valley is steep and narrow, the
construction quality of foundation treatment, ant-seepage system and dam body
filling becomes particularly important. The dam of Changheba Power Station is
gravel soil core-wall rock-filling dam, which is construction on the deep overburden,
with the dam height of 240m. The height of overburden and dam is 293m in total.
The seismic intensity reaches 9 degree. For the above reasons, the control of dam
deformation stability and seepage stability is very difficult and it requires high
design index and construction quality standard. The deep scientific research was
carried out for this project and it made plentiful achievements. This article briefly
introduces the engineering characteristics and construction difficulties of
1299
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik