Page - 1395 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1395 -
Text of the Page - 1395 -
2. GENERAL PROJECT DESCRIPTION
2.1. MAIN PROJECT FEATURES
Upgradation of Gomti Weir with water filled rubber dam at Lucknow (at
2.00 km D/S of Gomti Barrage) Uttar Pradesh, India.
The dam system has a length of in total about 256.20 meter and is
consisting of 4 sections with inflatable rubber dams and navigation channels on
right and left river bank.
The dimensions where chosen by a hydraulic calculation to provide sufficient
flood safety.
The system is described with the following data in brief:
Inflatable main weir sections with rubber dams, 4 main sections
(B+C+D+E), each with length 54 m and height 3.00 m
Navigation channel left side (F), width 16 m and heights 3.30 m at U/S
and 3.70 m at D/S, distance between U/s and D/S rubber dam: 17 m
Navigation channel right side (A), width 16 m and height 3.30 m U/S,
provision for a rubber dam on D/S
Regulation shaft building and water tank
Connecting pipe system between regulation shafts and rubber dam
sections
Automatic Control & Regulation System (CRS) for all rubber dam
sections with SCADA system in control building on top of regulation
shaft building
The Automatic Control & Regulation System (CRS) is maintaining a
head water level with up to 3.00 meter over the fixed sill level.
Manual control of the rubber dams in the navigation locks.
1395
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik