Fig. 4
Longitudinal section through water tank, regulation shaft and weir span “F”
For standard project cases the water for regulation purposes will be taken
from the reservoir directly. For the Gomti Project the Irrigation Department has
decided to maintain a separate water tank which will be feed by external water
from a water pipeline. The volume of the regulation tank was selected with
2,630 mÂł, which amounts to 60 % of the fill volume (app. 4,000 mÂł) of all the
rubber bodies. This covers the regulation process for almost the whole normal
operation of the system.
The general arrangement for the regulation system is consisting of:
ď‚· Water Tank with a reservoir volume for 2,630 mÂł water
ď‚· Regulation Shafts with regulation equipment such as pipes, pumps,
valves and safety devices
ď‚· Control Building on top of the shaft building at flood safe elevation - with
the electric control equipment for the whole rubber dam system
including navigation locks.
Fig. 5
Layout Control Shafts and Navigation Lock F
1398
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik