gauge has been dislocated and in the repeated test, only 2 cycles of the 3 have
been performed in the test.
In this regard and as far as possible, the loading is carried out in a way that
implementing the loading capacity causes it to enter or get near to the plastic
ambience of the rock mass and in other words loading is carried out up to near its
loading capacity, so as to distinguish the capacity of the bed affected materials.
The test results are provided as pressure-displacement curves or the soil
behavior curve and then analysis of the elasto-plastic ambience and analysis of
the behavior curve of the mass is carried out with variations in C, φ and γ
parameters and finally, the strength parameters can be estimated from the
obtained results.
5.2. CONSIDERING TEST RESULTS OF PRESSURE METER TESTING
In the Glevard dam spillway channel area, due to the deep excavation in soil,
a total of 21 pressure meter tests have been carried out in the exploration
boreholes drilled in the right abutment, including BH-22, BH-23 and BH-24 (totally
12 cases) and in the left abutment, including BH-25 and BH-26 (totally 9 cases), 3-
m paces, from 3 to 30 m, in sedimentary materials, fine-grained sub-surface layers
(clayey — silty to marly clayey or clayey sandy) and coarse-grained materials
(sand, gravel and marlstone) and in dry and saturated states. Mainly, these tests
have been carried out in two parts of alluvial surface and silty layer and the middle
marlstone layers. These tests have been detailed in table 2.
5.3. CONSIDERING TEST RESULTS OF PLATE LOAD TESTS
Plate loading test has been carried out in totally five locations in the spillway
channel slope area and location. They include PLT-1 and PLT-2 locations at the
right abutment and PLT-3 and PLT-4 locations at the left abutment and PLT-5
location in the middle of the bed, tending to the right abutment wall. Plate Loading
tests have been carried out in saturated state in locations PLT-1, PLT-2 and PLT-
3. Test results have been provided in pertaining tables and diagrams in the
attachment to the report. In these tables and diagrams, beside determining the
tested location, test cycles (1, 2 & 3), maximum load, maximum stress, total
settlement (St), elastic settlement (Se), difference between the total and elastic
settlements (St-Se) and modulus of elasticity and Poisson ratio have been
provided in table 3. Summary results of loading tests have been provided in table
3 and actually the modulus of elasticity in dry state is almost 2 to 2.5 times as the
saturated state.
Summing up the obtained results indicates relatively reasonable values for
the steady pressure coefficient of the soil with regard to the type of materials and
sediments of the right abutment, which are mainly coarse grained, and of the left
abutment, which are mainly fine grained. In this regard, calculating the values of
1414
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik