Page - 1438 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1438 -
Text of the Page - 1438 -
in the time domain over decades and a comprehensive multi-disciplinary analysis
with the boundary conditions of the overall national development in the
considered time period. Since such task would go far beyond the frame of this
report, further below we’ll aim only at the qualitative and structured presentation
of the main safety-related groups of problems of the small dams operation, the
sources of these problems and some ideas for solutions.
2. CURRENT SITUATION, LEGAL AND REGULATIVE ENVIRONMENT
2.1. STATE OF THE SMALL DAMS IN BULGARIA – GENERAL REMARKS
In the last several years, intensive work is being done by all involved
parties for qualitative improvement of the conditions for technical maintenance of
the dams in Bulgaria. In fact, there are no problems with the large ones owned
either by the National Electricity Company and serving with priority production of
electricity from hydropower, or by the state enterprise Irrigation Systems, or by
the water supply companies. They all have special operational units with
experienced staff and the necessary resources for proper maintenance of the
facilities. The main problems with the status – both technical and operational, are
connected most of all with the small dams owned by local municipalities.
However, a key person in the latter relation is the local district governor who is
directly responsible for the safety of every dam in the district and its appurtenant
structures. Once a year, he/she must organize an expert commission for analysis
of the status of these facilities. Twice yearly, every dam owner must arrange
thorough technical review of the facilities. In general, this has become a working
mechanism recently, however, the governors hardly have the resources needed
for implementation of the results from these analyses.
Since July 2015, the State Agency for Metrological and Technical
Surveillance (SAMTS) is officially responsible for all issues of the technical
operation of the dams in Bulgaria and their safety. This transition was
accompanied by a still running substantial transformation of both administrative
structures and regulative documents.
The Main Directorate “Supervision of dams and their appurtenant
structures” at SAMTS has only control functions, i.e. it is not engaged itself in
performing technical operation and / or maintenance of dams and their facilities.
In general, the experts there examine the technical state of the dams periodically,
formulate improvement requirements if necessary and control their fulfillment.
Currently, a global national information system is being developed with online
platform for data management and status monitoring of all dams in Bulgaria.
Although the SAMTS works together with all related parties if necessary,
some administrative tension sometimes arises, especially when contradictory
interests are present – for example, if an act of violation is drawn up of a dam
owner while it is objectively evident that he/she has not had the possibility to
1438
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik