requirements. The most economical location to pass around or under the dam and
meet the foregoing requirements should be selected. An alternate plan used for
some deep reservoirs has a high-level intake at the head of an inclined tunnel
connecting with a tunnel through the abutment near river level. After serving its
purpose of diversion during construction, the low-level tunnel is plugged at the
upstream side of the intersection and the inclined tunnel and downstream portion
of the low-level tunnel with a connecting curved transition from the permanent
outlet. This plan may be economical and satisfactory under special conditions
where the reservoir is very deep, the minimum water surface is high, and rock
foundation is adequate. Because of the difficult foundation and structural problems
involved in this type of construction, thorough foundation investigations and
comparative studies should be made and this plan should not be selected without
full analysis of its practicability and economy. The advantage of the high-level
intakes for a very deep reservoir is the lower intake structure and lower head on
intake gates, resulting in a less expensive intake structure. Disadvantages of this
type of outlet are: cost of the inclined tunnel, difficulty of obtaining an adequate
foundation for the intake structure, and the difficulty of excavation for and the
complexity of the transition structure at the junction of the inclined tunnel with the
low-level tunnel. Particular care should be taken to obtain high quality concrete,
smooth gradual curves, and good alignment at the junction. If the intake structure
is located directly over the low-level tunnel, there should be an ample thickness of
good, sound rock between the intake base and the tunnel to transmit the foundation
loads to the main rock mass. Sometimes conditions may be favourable for locating
the intake far enough to one side of the low-level tunnel to simplify the problem of
supporting the intake structure. For some high dams, outlet works separate from
diversion facilities and located much higher than the river channel may be suitable.
In such cases, overall economy may result from use of separate high-level outlets
and use of the downstream portion of the diversion tunnel as part of the spillway
outlet.
1542
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik