Page - 1609 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1609 -
Text of the Page - 1609 -
firstly managed by the Jatiluhur Development Project under the Department of
Public Works and Electric Power up to the year of 1970 and since then the dam
has been operated under the management of Jasa Tirta II Public Corporation.
Based on the results of the latest visual inspection, on the downstream slope
of Juanda Dam is not found any hard trees. The downstream part of the dam body
is covered by grass as a protector from rain water splashing, also serves as an
indicator when there is a wet area on the downstream slope. In Fig. 6 looks a hard
tree, all of which is in the original land, and there is no visible hard tree growing on
the dam body (embankment).
a. The downstream of Juanda Dam b. Upstream toward downstream
Fig 6. Upstream and downstream Juanda Dam
(Source: Jasa Tirta II Public Corporation)
REFERENCE
[1] BAMBARA, G., CURT, C., MERIAUX, P. (2016). Modular assessment of the
performance of Embankment dams
[2] SCHLEISS, A. (Ed.), BOES, R. (Ed.). (2012). Dams and Reservoirs under
Changing Challenges. London: CRC Press.
[3] FEMA. (2005). Technical Manual for Dam Owners - Impact of Plants on Earthen
Dam
1609
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik