Page - 1661 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1661 -
Text of the Page - 1661 -
Fig.1
Theaxial-section geological formation of the dam
2. THE LAYOUT OF SEEPAGE OBSERVATION POINTS
Seepage observation points are distributed in the cross sections of 0+500,
0+850, 1+130, 1+300 and 1+650(mark B). Observation points of dam body and
foundation are distributed in front and back of seepage control measures. Some
standpipes are used to monitor the groundwater level also (mark S). There are
five seepage discharge observation points in the sections of 1+020 (L1), 1+250
(L2), 1+280 (L3), 1+450 (L4) and 1+650 (L5). The observation layout is shown in
Fig. 2 and Fig. 3.
Fig. 2
The plane distribution of seepage observation points
0
+
6
0
0
weir
borehole
standpipe
Legend
S
B
L
1661
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik