acceptable level. In addition, with the installation of piezometers, there is now
greater certainty in relation to the uplift pressures under this dam.
3. CLARK DAM CASE STUDY
3.1. BACKGROUND
Clark Dam is a 67 m high concrete arch gravity dam that impounds Lake
King William in the central highlands of Tasmania. Initial construction was
completed in 1951 and raising was undertaken in 1964.
As part of the program of works, 12 piezometers were installed from the
gallery at locations across the dam in 2011–12. Fig. 5 provides a plan and long
section of the dam that also shows the location of the drainage gallery and
piezometers.
Fig. 5
Clark Dam – Plan and long section
1674
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik