design limit without temperature crack occurred.
Key words: P·LH cement, dam concrete, temperature control and crack resistance,
duration of forms removal, rinsing duration, ultra high arch dam
0. GENERAL
With increase of ultra arch dams constructed or being constructed in China,
the dam height is beyond global record, such as Xiaowan(294.5m),
Xiluodu(285.5m), the first cascade of Jinping(305m) and Baihetan(289m) together
with Wudongde(270m)[1]. As thin dam body with high stress, compressive strength
and durability of concrete, relevantly smaller cementitious ratio and larger unit
usage of cementitious material on concrete will cause self-constriction of concrete
and temperature shrinkage, and big self-constriction, temperature control and
crack resistance are critical. “Moderate heat Portland cement (P·MH) + 35% I fly
ash” as cementitious material was generally used in most of 300m high arch dams
in China. Although concrete performance can meet the design requirement, the
temperature control measures and management have reach current technical limit,
and the safe factor can only be greater than 1.8 even in strict accurate
management. The temperature crack will occur while careless in the process of
implementation, which is harmful to structure safety and impermeability worse to
influence the construction duration and investment directly. Therefore, high
attention shall be paid to temperature crack resistance of concrete. From the view
of the material, it is necessary to research a kind of special low heat Portland
cement(P.LH) to own the characteristics of temperature risen slowly, small
temperature rise and high performance of complicated crack resistance.
P.LH cement study was started in the regional position in Three Gorges
Project, afterwards it has been used in diversion tunnel, flood discharge tunnel and
absorption basin in Xiangjiaba, Xiluodu, Wudongde and Baihetan projects.
Referring to dam characteristics and tech requirement of Wudongde and Baihetan,
further systematic test study and proven consultation[2][3] on P.LH cement have
been implemented in the aspects of structure safety, material feature, temperature
crack resistance, construction tech and long-term feature. Final decision has been
made P.LH concrete will be applied in the two 300m ultra arch dam.
1679
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik