Barrier Wall construction, grout curtains were installed 3.6 m upstream and
downstream of the wall alignment from 2009 to 2010.
4. REMEDIATION BY A CONCRETE BARRIER WALL
4.1. ENCASEMENT WALL FOR DAM SAFETY
Trenches excavated during barrier wall construction had the potential to
intersect open solution features and connect the slurry-filled trench with the
reservoir or the tail water and in this way cause a sudden and substantial loss of
fluid. Apart from the environmental impact, such a fluid loss could destabilize the
excavation trench and therefore put the dam embankment at risk. To address
such a risk, an encasement wall was built that extends from the crest of the dam
down to a minimum of 0.6 m into the foundation bedrock. In this configuration, the
encasement wall would support the embankment by bearing earth and water
pressure in the event of trench fluid loss, protecting both the embankment and
the excavation equipment. The encasement wall was installed using three
different approaches ().
Fig. 3 As build Encasement wall panel layout.
1695
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik