After installation of the special encasement wall mono blocks adjacent to
each other at the upstream side of the existent concrete dam (see chapter 4.3),
the joints between individual mono blocks were closed by closing piles to assure
the specified function of the encasement wall.
During the installation of the mono blocks (MB) and mono block closing
piles (MBCP) construction data and quality control data had been examined and
after acceptance the elements excavated and concreted. Based on these
construction and quality control data and the barrier wall construction practices as
proven during the installation of other elements in the main barrier wall earlier
accepted to be sufficient, permission was granted to install the six typical barrier
wall panels (Fig. 6) in the area along the concrete dam for the following reasons:
ď€ All mono blocks and mono block closing piles excavations have held
bentonite slurry or water without appreciable fluid loss during their
construction.
ď€ Video footage taken in mono block closing pile excavations of the
mono block-to-mono block joints, and the rotated cutter panel-to-mono
block joints indicate relatively tight joints between adjacent elements.
Fig. 6 Layout of barrier wall panels along the monolith 29 with perpendicular
tie-in-panel element TY1487.
Fig. 7 Tie-in detailed design by BAUER
1699
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik